It is time again, time to change the PMP exam.
It is time again, where organizations who thrive on exam preparation classes, to start intensifying their marketing. “Last chance”, “Hurry”, “the exam is changing so why wait”, and comments like this. This is an effort to drive business and we understand that.
Our post is for those who are considering the PMP, or CAPM, or any other certification for that matter. Should you care?
It depends!
What we know?
- What we know is that the exams change, because the main standard that they refer to is changing
- This standard, or guide, is the PMBOK Guide
- The PMBOK Guide include a small section (part of chapter 3 in the last edition and now an appendix in the 5th edition) is an ANSI standard
- ANSI is the American National Standard Institute
- Because part of the PMBOK is an ANSI standard it has to be revised every four years
- Even though the PMI exams are not totally dependent on the PMBOK, the PMBOK does influence it so as a result of the PMBOK changing the exam also changes.
Great – but still why should I worry?
In our humble opinion, you should worry or care. However, you need to know of the change, so you know which book you use to study.
Are the changes significant?
In term of the guide itself, it changes every four years. Most of the time the changes are minor, or at least no significant change in the structure. The changes are typically:
- Adding or deleting a few processes
- Moving a process from one process group to another
- Moving a process from one knowledge area to another
- Renaming some of the processes
- Adding text to a section or adding a new definition
- Since the original PMBOK twice there were an addition of a knowledge area (Integration in 2000 and Stakeholders in 2012)
- For more information about the changes from the 4th to 5th edition, refer to the 5th edition, there is an appendix that explain these changes.
Great, we know all of the above – what else should i know or why the marketing rush?
Ignore the marketing rush, all you need to know is the following:
- Depend on your level of expertise and knowledge of PMBOK, you might need 3 to 6 months to prepare for the PMP
- If you have been studying and have made good progress then you should ask yourself – TODAY – “do I think I can be ready in May or June, at the latest”? If yes, then continue to study with existing materials and ignore all else.
- On the other hand, if you have not been studying, then we advise you to wait and take a course or study based on the newest edition.
The marketing hype, may implicitly push an idea that the new exam might be more difficult. Or capitalize on uncertainty and the fear of uncertainty. Again – IGNORE all. The PMP has been around for almost 30 years and the exam change every 4 years – so big deal.
To close – you should only be concerned if you have been studying but not ready to commit. In that case, when you are ready to commit and start studying – you can start – what you learned so far is NOT changing in any significant manner.
May I know if I take the 5th edition of the exam this month August 2013, the results may not be displayed on the day I take the PMP exam?
Dr Pramod
You need to ask this question to PMI for the official answer since they could have changed the process.
In the past, with exam changes, the first group that go through the revised exam do not know the result immediately since PMI need to have enough examinees to set the passing score (this is per their standard guidelines).
Now i am not sure how many people need to take the exam before they set the passing scores or when will this transition period be over.
Thank You very much Sir.Appreciate your goodself for the prompt reply.
Thanks a lot for your great feedback and participation.
Other further questions, since i went through the āpmp-certification-exam-outline” as you recommand.
I noticed that in Kowledge and Skills there are new items have been added. For example, in Monitor and Control Domain there are additions for instance:
Process Analysis tachniques (e.g, LEAN, Kanban, Six Sigma)
Project quality best practise and standereds (e.g., ISO, BS, CMMI, IEEE)
The questions:
Do I have to learn and study the above tachniques, best practise, and standrerds? In order to be aware and able to answer any question comes for this in exam?
Do these additions in Kowledge and Skills affect my preperation for PMP? Since once I compered pervious Exam outline published in 2011 with this new 2015, there are some major additions/changes in Kowledge and Skills thoughout all Demains.
Again, I would like to greatly thank you for making me positive š
All the best,
Faisal
With the PMP all you need to know that these are techniques you can use to analyze a process but you do not have to know how to do